Water&Power 008

Ren helped me install the second layer of 12 gauge sheets to the bases. In the lovely "November in Colorado" wind - a 30 mph gust can sure make 150 pounds feel like 300. Yippee! Drilled and placed over 200 rivets over the course of three days.

Bitching aside, it's that much closer to being done.

6 comments:

runnerfrog said...

How come that I never found this blog before?! Your work rocks, I'm amazed of what you're showing here in thoughts, process and results.

exocubic said...

Thanks for the compliments - and sorry about the loss of your laptop and artwork. That sucks.

runnerfrog said...

Thanks for the sympathy, anyway I've learn to let go some time ago, and that every loss can bring better to replace the lost.
I'll be following to see what's the next project.

Aspen said...

Mark your piece looks fantastico. I drove by it early sat morn. Hope the reception was great on Friday... I would have liked to be there, but I was at work. Again - congratulations!!

exocubic said...

Schmaren! Thanks - and you should be glad you missed the dedication, it was pretty boring. I did have to give a speech (a fact which I had not been informed of), so you missed a good chance to laugh at me, though.

Philip said...

Fantastic work!