Exocubic Studio

Exocubic Studio

Skinning the bases.

W P  skinning the bases 008

Ren helped me install the second layer of 12 gauge sheets to the bases. In the lovely “November in Colorado” wind - a 30 mph gust can sure make 150 pounds feel like 300. Yippee! Drilled and placed over 200 rivets over the course of three days.

Bitching aside, it’s that much closer to being done.