Weaving Interwoven: The Beginning.

Now that I’ve bent some tabs, the actual assembly can start. First steps are to figure out which part goes where; I’ve employed a letter-plus-number system cut right into the metal to try to simplify this process. Seems to be working OK, but ascertaining “front” and “back” on a form without them is somewhat problematic.  It’s just a matter of playing “who’s your neighbor” and keeping track of those relationships. I divided the form up into 13 “modules” consisting of the sheetmetal surrounding each hole. Beyond planning, the actual assembly is aided by the use of these little doodads called “Clecos,” which are spring-loaded temporary rivets that hold things in position until actual rivets can be added. Pneumatic riveter for the win. (I “love” “using” “quotes,” apparently.)

Leave a Reply

Your email address will not be published. Required fields are marked *